Friday, March 29, 2024

Advertisement
Home » OOH News » DMRC takes over Rapid Metro operation from last night

DMRC takes over Rapid Metro operation from last night

By M4G Bureau - October 23, 2019

With this takeover, the total operational Metro network Delhi and NCR has now become 389 KM with 285 stations

As reported by Media4Growth, the Delhi Metro Rail Corporation (DMRC) announces the takeover of the Rapid Metro Link, Gurugram developed by Rapid Metro Rail Gurgaon Limited (RMGL) and Rapid Metro Rail Gurgaon South Limited (RMGSL)’s operations and maintenance from last night i.e, 22nd October 2019 (Tuesday). The services of the 11.6 km long corridor will continue to operate as per the normal time table as earlier.

DMRC is committed towards providing the best possible services to the commuters of Rapid Metro line. The DMRC management has already deployed adequate staff to maintain station Operations, Train Operations, Signalling and Telecom, Electrical, Traction, Safety and Security etc. so that the passenger services may be maintained in a smooth and trouble-free manner.

With the takeover of operations of Rapid Metro, the total operational Metro network Delhi and NCR has now become 389 KM with 285 stations which includes the NOIDA-Greater NOIDA corridor.

The names of the stations covered by the Rapid Metro system are Sector 55-56, Sector 54 Chowk, Sector 53-54, Sector 42-43, Phase -1, Sikanderpur, Phase-2, Phase-3, Moulsari Avenue, IndusInd Bank Cybercity, Vodafone Velvedere Towers.

The train services on the corridor start at 6 AM in the morning from Sector 55-56 station and Sikenderpur Station with a frequency of 4.30 minutes during moring peak hours and 5.15 minutes during evening peak hours. The last revenue train service departs at 10 PM from Sector 55-56 station.

For more updates, subscribe to media4growth newsletter - Click here

Advertisement

Related News

You May Also Like

Advertisement
Advertisement
Have You Say
Advertisement